Form Center

By signing in or creating an account, some fields will auto-populate with your information.

Conditional Use Permit Application

  1. City of Whitewater

    312 W. Whitewater Street
    P.O. Box 178
    Whitewater, WI 53190
    262-473-0540
    www.whitewater-wi.gov

  2. Conditional Use Permit Application
  3. NOTICE:

    The Plan Commission meetings are scheduled at 6:00 p.m. on the 2nd Monday of the month.  All complete plans must be in by 4:00 p.m. four weeks prior to the meeting.

  4. Existing and Proposed Uses:
  5. Conditions

    The City of Whitewater Zoning Ordinance authorizes the Plan Commission to place conditions on approved conditional uses.  "Conditions" such as landscaping, architectural design, type of construction, construction commencement and completion dates, sureties, lighting, fencing, plantation, deed restrictions, highway access restrictions, increased yards or parking requirements may be affected.  "Conditional Uses" may be subject to time limits or requirements for periodic review by staff.

  6. APPLICATION REQUIRMENTS

    THE FOLLOWING INFORMATION MUST BE SUBMITTED IN ORDER TO CONSIDER THE APPLICATION COMPLETE:

    1.  Statement of use, including type of business with number of employees by shift.
    2.  Scaled plot plan with north arrow, showing proposed site and all site dimensions.
    3.  All buildings and structures; location, height, materials and building elevations.
    4.  Lighting plan; including location, height, materials and building elevations.
    5.  Elevation drawings or illustrations indicating the architectural treatment of all proposed buildings and structures.
    6.  Off-street parking; locations, layout, dimensions, circulation, landscaped areas, total number of stalls, elevation, curb and gutter.
    7.  Access; pedestrian, vehicular, service.  Points of ingress and egress.
    8.  Loading ; location, dimensions, number of spaces internal circulation.
    9.  Landscaping: including location, size and type of all proposed planting materials.
    10. Floor plans: of all proposed buildings and structures, including square footage.
    11. Signage: Location, height, dimensions, color, materials, lighting and copy area.
    12. Grading/draining plan of proposed site.
    13.  Waste disposal facilities; storage facilities for storage of trash and waste materials.
    14. Outdoor storage, where permitted in the district; type, location, height of screening devices.

    **One (1)  full size, Fifteen (15) 11.x17, and One (1) Electronic Copy (include color where possible) site plan copies, drawn to scale and dimensioned.

  7. STANDARDS FOR REVIEW AND APPROVAL

    The Plan and Architectural Commission shall use the following standards when reviewing applications for conditional uses.  The applicant is required to fill out the following items and explain how the proposed conditional use will meet the standard for approval.

  8. Standards
  9. ** Refer to Chapter 19.66 of the City of Whitewater Municipal code, entitled CONDTIONAL USES, for more information.
  10. TO BE COMPLETED BY THE NEIGHBORHOOD SERVICES DEPARTMENT

    1.  Application was filed and the paid at least four weeks prior to the meeting.  $100.00 fee 

  11. Public Comments may also be submitted in person or in writing to City Staff.
  12. At the conclusion of the Public Hearing, the Plan Commission will make a decision.
  13. ACTION TAKEN
  14. Tips for Minimizing Development Review Costs-A Guide for Applicants

    The City of Whitewater assigns its consultant cost associated with reviewing development proposals to the applicant requesting development approval.  These costs can vary based on a number of factors. Many of these factors can at least be partially controlled by the applicant for development review.  The City recognizes that we are in a time when the need to control costs is at the forefront of everyone's minds.   The following guide is intended to assist applicants for City development approvals understand what they can do to manage and minimize the costs associated with review of their application.   The tips included in this guide will almost always result in a less costly and quicker review of an application.

    MEET WITH NEIGHBORHOOD SERVICES DEPARTMENT BEFORE SUBMITTING AN APPLICATION

    If you are planning on submitting an application for development review, one of the first things you should do is have a discussion with the City's Neighborhood Department.  This can be accomplished either by dropping by the Neighborhood Services Department counter at City Hall, or by making an appointment with the Neighborhood Services Director.  Before you make significant investments in your project, The Department can help you understand the feasibility of your proposal, what City plans and ordinances will apply, what type of review process will be required, and how to prepare a complete application.

    SUBMIT A COMPLETE AND THOROUGH APPLICATION

    One of the must important things you can do to make your review process less costly to you is to submit a complete, thorough, and well-organized application in accordance with City ordinance requirements.  The City has checklists to help you make sure your application is complete.  To help you prepare an application that has the right level of detail and information, assume that the people reviewing the application have never seen your property before, have no prior understanding of what you are proposing, and don't necessarily understand the reasons for your request.

    FOR MORE COMPLEX OR TECHNICAL TYPES OF PROJECTS, STRONGLY CONSIDER WORKING WITH AN EXPERIENCED PROFESSIONAL TO HELP PREPARE YOUR PLANS

    Experienced professional engineers, land planners, architects, surveyors, and landscape architects should be quiet familiar with standard developmental review processes and expectations.  They are also generally capable of preparing high-quality plans that will ultimately require less time (i.e., less cost for you) for City's planning and engineering consultants to review, saving you money in the long run.   Any project that includes significant site grading, stormwater management, or utility work; significant landscaping; or significant building remodeling or expansion generally requires professionals in the associated fields to help out.

    FOR SIMPLER PROJECTS, SUBMIT THOROUGH, LEGIBLE, AND ACCURATE PLANS

    For less complicated proposals, it is certainly acceptable to prepare plans yourself rather than paying to have them prepared by a professional.  However, keep in mind that even though the project may be less complex, the City's staff and planning consultant still need to ensure that your proposal meets all City requirements.  Therefore, such plans must be prepared with care.  Regardless of the complexity, all site, building and floor plans should:
    1.  Be drawn to be recognized scale and indicate what the scale is (e.g. 1 inch=40 feet).  
    2.  Include titles and dates on all submitted documents in case pieces of your application get separated.
    3.  Include clear and legible labels that identify streets, existing and proposed buildings, parking areas, and other site improvements.
    4.  Indicate what the property and improvements look like today versus what is being proposed for the future.
    5.   Accurately represent and label the dimensions of all lot lines, setbacks, pavement/parking areas, building heights , and any other pertinent project features.
    6.  Indicate the colors and materials of all existing and proposed site/building improvements.  Including color photos with your application is one inexpensive and accurate way to show the current conditions of the site.  Color catalog pages or paint chips can be included to show the appearance of proposed signs, light fixtures, fences, retaining walls, landscaping features, building materials or other similar improvements.

    SUBMIT YOUR APPLICATION WELL IN ADVANCE OF THE PLAN AND ARCHITECTURAL REVIEW COMMISSION MEETING

    The city normally requires that a complete application be submitted four (4) weeks in advance of the Commission meeting when it will be considered.  For simple submittals not requiring a public hearing, this may be reduced to two (2) weeks in advance.  The further in advance  you can submit your application, the better for you and everyone involved in reviewing the project.   Additional review time may give the City's planning consultant and staff an opportunity to address those issues before the Plan and Architectural Review Commission meeting.  Be sure to provide reliable contact information on your application form and be available to response to such questions or requests in a timely manner.

    FOR MORE COMPLEX PROJECTS, SUBMIT YOUR PROJECT CONCEPTUAL REVIEW

    A conceptual review can be accomplished in several ways depending on the nature of your project and your desired outcomes.

    1. Preliminary plans may be submitted to City staff and the planning consultant for a quick informal review.  This will allow you to gauge initial reactions to your proposal and help you identify key issues; 
    2.  You may request a sit-down meeting with the Neighborhood Services Director and or Planning consultant to review and more thoroughly discuss your proposal; and/or
    3. You can ask to be placed on  a Plan and Architectural Review Commission meeting agenda to present and discuss preliminary plans with the Commission and gauge it's reaction before formally submitting your development review application.

    Overall, conceptual reviews almost always save time, money, stress, and frustration in the long run for everyone involved.  For this reason, the City will absorb up to $200 in consultant review costs for conceptual review of each project.

    HOLD A NEIGHBORHOOD MEETING FOR LARGER AND POTENTIALLY MORE CONTROVERSIAL PROJECTS

    If you believe your project falls into one or both of these two categories (City staff can help you decide), one way to help the formal development review process go more smoothly is to host a meeting for neighbors and any other interested members of the community.   This would happen before any Plan and Architectural Review Commission meeting and often before you even submit a formal development review application.

    A neighborhood meeting will give you an opportunity to describe your proposal, respond to questions and concerns, and generally address issues in an environment that is less formal and potentially less emotional than a Plan and Architectural Review Commission meeting.  Neighborhood meetings can help you build support for your project, understand other's perspectives on your proposal, clarify misunderstandings, and modify the project and alleviate public concerns before the Plan and Architectural Review Commission meetings.  Please notify the City Neighborhood Services Director of your neighborhood meeting date, time and place; make sure all neighbors are fully aware (City staff can provide you a mailing list at no charge); and document the outcomes of the meeting to include with your application.

  15. TYPICAL CITY PLANNING CONSULTANT DEVELOPMENT REVIEW COSTS

    The City often utilizes assistance from a planning consultant to analyze requests for land development approvals against City plans and ordinances and assist the City's Plan and Architectural Review Commission and City Council on decision making.  Because it is the applicant who is generating the need for the service, the City's policy is to assign most consultant costs associated with such review to the applicant, as opposed to asking general taxpayer to cover these costs.

    The development review costs provided below represent the planning consultant's range of costs associated with each particular type of development review.   This usually involves some initial analysis of the application well before the public meeting date, communication with the applicant at that time if there are key issues to resolve before the meeting, further analysis and preparation of a written report the week before the meeting, meeting attendance, and sometimes minor follow-up after the meeting.  Cost vary depending on a wide range of factors, including the type of application, completeness and clarity of the development application, the size and complexity of the proposed development, the degree of cooperation from the applicant for further information, and the level of community interest.  The City has a guide called "Tips for Minimizing Your Development Review Costs" with Information on how the applicant can help control costs.

  16. Type of development review being requested and planning consultant review cost range
  17. Minor Site/Building Plan (e.g., minor addition to building, parking lot expansion, small apartment, downtown building alterations)
  18. Major Site/Building Plan (e.g., new gas station/convenience store, new restaurant, supermarket, larger apartments, industrial building)
  19. Conditional Use Permit with no Site plan Review (e.g., home occupation, sale of liquor request, substitution of use in existing building)
  20. Rezoning
  21. Land Division
  22. Annexation
  23. **Note: The City also retains a separate engineering consultant, who is typically involved in larger projects requiring storm water management plans, major utility work, or complex parking or road access plans. engineering costs are not included above, but will be assigned to the development review applicant. The consultant planner and engineer closely coordinate their reviews to control costs.
  24. Cost Recovery Certificate and Agreement

    The City may retain the services of professional consultants (including planners, engineers, architects, attorneys, environmental specialists, and recreation specialists) to assist in the City's review of an application for development review coming before the Plan and Architectural Review Commission, Board of Zoning Appeals and/or Common Council.  In fact most applications require some level of review by the City's planning consultant. City of Whitewater staff shall retain sole discretion in determining when and to what extent it is necessary to involve a professional consultant in the review of an application.

    The submittal of an application or petition for development review by an applicant shall be construed as an agreement to pay for such professional review services associated with the application or petition.  The City may apply the charges for these services to the applicant and/or property owner in accordance with this agreement.  The City may delay acceptance of an application or petition (considering it incomplete), or may delay final action or approval of the associated proposal, until the applicant pays such fees or the specified percentage thereof.  Development review fees that are assigned to the applicant, but that are not actually paid, may then be imposed by the City as a special charge on the affected property. 

  25. SECTION A: BACKGROUND INFORMATION-to be completed by the Applicant/Property Owner
  26. Project Information
  27. Property Owner Information (if different from applicant):
  28. SECTION B: APPLICANT/PROPERTY OWNER COST OBLIGATIONS. To be filled out by the Neighborhood Services Department

    Under this agreement, the applicant shall be responsible for the costs indicated below.  In the event the applicant fails to pay such costs, the responsibility shall pass to the property owner, if different.  Costs may exceed those agreed to herein only by mutual agreement of the applicant, property owner and City.  If and when the City believes that actual costs incurred will exceed those listed below, for reasons not anticipated at the time of the application or under the control of the City administration or consultants, the Neighborhood Services Director or his agent shall notify the applicant and property owner for their  approval to exceed such initially agreed costs.   If the applicant and property owner do not approve such additional costs, the City may, as permitted by law, consider the application withdrawn and/or suspend or terminate further review and consideration of the development application.  In such case, the applicant and property owner shall be responsible for all cost incurred up until that time.

  29. Balance of costs

    The balance of the applicant's costs, not due at time of application, shall be payable upon applicant receipt of one or more itemized invoices from the City.  If the application fee plus actual planning and engineering consultant review costs end up being less than the 25% charged to the applicant at the time of application, the City shall refund the difference to the applicant.

  30. SECTION C: AGREEMENT EXECUTION -to be completed by the Applicant and Property Owner

    The undersigned applicant and property owner agree to reimburse the City for all costs directly or indirectly associated with the consideration of the applicant's proposal as indicated in this agreement, with 25% of such costs payable at the time of application and the remainder of such costs payable upon receipt of one or more invoices from the City following the execution of development review services associated with the application.

  31. Leave This Blank:

  32. This field is not part of the form submission.